Aljouf Airport

Customer
Cube Metal Industries Co.
Location
Jeddah, Saudi Arabia
Year of construction
2023
Project duration
1 year
Use of HiCAD
HiCAD made it easier to create clear projections in the workshop drawings for areas with multiple material connections. With other software solutions, such as 2D software, this project would have been more difficult and less accurate.
Challenges
One of the challenges was the complexity of individual components and being able to assign them to each other holistically.

Go back

My ISD account