The bill of materials (BOM) is a list of semi-finished products, parts, assemblies, and upper assemblies that are required to manufacture a product.The bill of materials output is a report format based on the product structure - i.e. based on the assembly structure or the part usage. Known report formats are e.g. - Structure BOM (differentiated according to installation structure / assembly kits),- 1-level assembly BOM (differentiated according to installation structure, 1-level assembly only) - Quantity overview BOM (undifferentiated quantity breakdown), - Complex BOM ("Super BOM", contains all variants of possible designs) as well as MRP BOM and multiple BOM. The sovereignty for the output of BOMs has usually the ERP system, because in ERP on the basis of basic data the order context (order data) is produced and managed and the BOM usually represents the demand / procurement for an order or across orders a period. The output of design BOMs from CAD or PDM is often used to enter the structure information into the ERP basic data. See also: Product structure / Bill of materials